¡öNational Important
Technical Equipment,'Eighth Five' Technique Tackling
Project, designed and produced with international
advanced technique.¡£
¡öAuthenticated
by Beijing Mechanical industry Bureau and National
Mechanical industry Ministry, obtain Beijing Technical
Advancement 3rd Grade Award,
introduced and recommended by " Electric Whole
Set Equipments Information" of the Whole Set
Equipment Bureau, Electric Ministry.
¡öPass the tests
of inherent frequency, heat transfer performance,
hydrodynamic resistance and air tightness. Measure
up the technical requirements of NBFJ2001D, ALSTHOM
and can substitute import product of same kind.
¡öExcellent,
stable and safe. Our products run and are checked
in many large steamer generators, such as Neimeng
Datela and Zhejiang Taizhou power plants 330MW, Hebei
Shalinzi power plant 300MW, Guangxi Liuzhou and Tianjin
Junliang power plants 200MW, Jiangsu Jiangyin power
plant 125MW and Baoding thermal power plant 50MW.
¡öHave a wide
application area. Our products can be equipped for
large and medium steamer generators and replace air
coolers for nuclear power plant, diesel generator
and other kind of generator.
¡öEfficient,
energy saving and compact.
¡öFins are fixed
on tubes by expansion across the whole length. Tubes
are fixed on the plates on two ends by expending the
pipe. Our products have six traits in contrast to
traditional type.
¡öResistance
on air-side of same volume decreases 15 percent.
¡öCooling water
consumption of same capacity decreases 40~50 percent.
¡öGood anti-vibrancy
and no leakage. Fins are pressed into a whole body
and clapboards are added.
¡öGood erosion-resistance.
We adopt special metal that can prolong running duration.